Simulasi Perbaikan Tata Letak Fasilitas Produksi Untuk Meminimalisir Jarak Perpindahan di Industri Katering Nara Kitchen
DOI:
https://doi.org/10.55606/isaintek.v7i1.211Keywords:
Layout, Simulation, Blocplan, Travel Distance, FlexsimAbstract
Nara Kitchen is a daily catering service provider with a varied menu every day. Since the Covid-19 pandemic, catering demand has increased to 130 portions per delivery. This surge in demand necessitates improvements to the layout of production facilities, as higher production volume results in increased activity between workstations. Consequently, Nara Kitchen aims to enhance the layout of its facilities to optimize production efficiency. Facility layout improvements are implemented using the Blocplan method and are simulated through a discrete systems approach. The Blocplan method designs the layout based on the proximity between departments, aiming to minimize overall travel distance. The results of the layout improvements are then simulated using Flexsim software before being implemented. The simulation outcomes demonstrate reduced weekly travel distances. The movement distance for workers traveling from the kitchen workstation to the compounding workstation has decreased by 5.33m, while workers moving from the kitchen workstation to the packing workstation experience a reduction in movement distance of 142.38m
References
Arifin, Miftahol. 2009. Simulasi Sistem Industri.
Awandani, Hanif, Inaya Lia Anugrah, Raisa Adjeng Aldhiza, and Salwa Kamilia Hasna. 2019. “PERANCANGAN TATA LETAK FASILITAS PADA UKM FANRI COLLECTION YOGYAKARTA MENGGUNAKAN SOFTWARE FLEXSIM 6.0.” Conference on Industrial Engineering and Halal Industries (CIEHIS).
Bisri, Mukhammad Hasan, and Atikha Sidhi Cahyana. 2023. “Production Facility Layout Redesign Using Systematic Layout Planning And Blocplan Methods.” Procedia of Engineering and Life Science 3. doi: 10.21070/pels.v3i0.1349.
Burke, Mike. 2020. Applied Ergonomics Handbook.
Dweiri, Fikri. 1999. “Fuzzy Development of Crisp Activity Relationship Charts for Facilities Layout.” Computers and Industrial Engineering 36(1). doi: 10.1016/S0360-8352(98)00102-8.
Fahturrohman, Dimas Wahyu, and Wiwik Sumarni. 2023. “Proposed Layout Design of Production Facilities Using Group Technology To Improve Utility.” Procedia of Engineering and Life Science 3. doi: 10.21070/pels.v3i0.1364.
Hapsari, Yaning Tri, and Kurniawanti Kurniawanti. 2020. “PERANCANGAN TATA LETAK FASILITAS PRODUKSI PEYEK.” Jurnal Terapan Abdimas 5(1). doi: 10.25273/jta.v5i1.4644.
Lin, Qing Lian, Hu Chen Liu, Duo Jin Wang, and Long Liu. 2015. “Integrating Systematic Layout Planning with Fuzzy Constraint Theory to Design and Optimize the Facility Layout for Operating Theatre in Hospitals.” Journal of Intelligent Manufacturing 26(1). doi: 10.1007/s10845-013-0764-8.
Lucitasari, Dyah Rachmawati, Intan Berlianty, Andana Dwi Aprilia Rakadiputra, Irwan Soejanto, and Yuli Dwi Astanti. 2018. “Usulan Tata Letak Area Parkir Tepi Jalan Umum Menggunakan Simulasi.” Tekinfo: Jurnal Ilmiah Teknik Industri Dan Informasi 7(1). doi: 10.31001/tekinfo.v7i1.362.
Miftahol Arifin, and Ekawati Martianingsih. 2022. “MASALAH TATA LETAK FASILITAS LOGISTIK DENGAN MENGGUNAKAN FUZZY DYNAMIC ANALITYCAL HIERARCHY PROCESS (FDAHP).” Jurnal Ilmiah Sistem Informasi Dan Ilmu Komputer 2(2). doi: 10.55606/juisik.v2i2.223.
Pangestika, Jeny Widya, Niken Handayani, and Muhammad Kholil. 2017. “Usulan Re-Layout Tata Letak Fasilitas Produksi Dengan Menggunakan Metode Slp Di Departemen Produksi Bagian Ot Cair Pada Pt Ikp.” Jisi : Jurnal Integrasi Sistem Industri 3(1).
Ukurta Tarigan, Robby Simbolon, Meilita T Sembiring, Uni Pratama P Tarigan, Nurhayati Sembiring, and Indah R Tarigan. 2019. “PERANCANGAN ULANG DAN SIMULASI TATA LETAK FASILITAS PRODUKSI GRIPPER RUBBER SEAL DENGAN MENGGUNAKAN ALGORITMA CORELAP, ALDEP, DAN FLEXSIM.” Jurnal Sistem Teknik Industri 21(1). doi: 10.32734/jsti.v21i1.905.
Yulia, Nabila Tsaniatu, and Atikha Sidhi Cahyana. 2022. “Facility Relayout Using Systematic Layout Planning and Blocplan Methods to Minimize Material Handling Distance.” Procedia of Engineering and Life Science 2(2). doi: 10.21070/pels.v2i2.1231.