Analisis Percepatan Pembangunan Gedung Asrama Mahasiswa Nusantara Manado dengan Penerapan Building Information Modelling (BIM)
DOI:
https://doi.org/10.55606/isaintek.v8i2.352Keywords:
Building information modelling, scheduling, quantity take off, fast trackAbstract
The construction of the Manado Student Dormitory (AMN) is one of the President's priorities, the construction of which is based on PP No. 106 of 2021. The aim of building the AMN is so that students from various regions studying in North Sulawesi can interact with each other and get to know and respect each other's cultures. After the pre-construction meeting (PCM) was carried out, the service user instructed that acceleration be made by shortening the implementation time. To implement these instructions, PT. Widya Satria implemented the BIM (building information modelling) system to accelerate the work, by modelling the construction phase starting from BIM 3D (modelling), BIM 4D (scheduling), and BIM 5D (quantity take off). Accelerating work is carried out by applying the fast track method so that any work that has a long critical path time can be shortened by overlapping work between one stage and another that can be done together. The implementation results simulate that the work can be completed faster than the contract time with a workforce requirement of 296 people, 1 (one) tower crane unit, and 1 (one) mobile crane work unit, even after implementing BIM in the construction of AMN Manado, all stakeholders It is easy for the holder to coordinate and control work progress.
References
Anjas Fadhilah, Edy Purwanto, Achmad Basuki
APLIKASI BUILDING INFORMATION MODELING (BIM) DALAM PERANCANGAN BANGUNAN GEDUNG , Jurnal Matriks Teknik Sipil DOI: https://doi.org/10.20961/mateksi.v10i3.55999 ISSN: 2354-8630 E-ISSN:2723-4223 Vol 10, No 3 (2022): September e-Jurnal MATRIKS TEKNIK SIPIL/September 2022/264
Berlian C, Adhi R, Hidayat A. 2016 Perbandingan Efisiensi Waktu, Biaya, dan Sumber Daya Manusia Antara Metode Building Information Modelling (BIM) dan Konvensional (Study Kasus: Perencanaan Gedung 20 lantai) Jurnal Karya Teknik Sipil.
Devi Prameswari Ayu Kusuma, Sara Prihantina, Hermawan dan Budi Hasiholan, IMPLEMENTASI PENERAPAN BIM-BASED LCA PADA PEMBANGUNAN GEDUNG, konteks 16, Bali 27 -28 oktober 2022
Eastman, C., Teichloz, P., Sacks, R., & Liston, K. (2008). BIM Handbook: A Guide to Building Information Modelling for Owners, Managers, Designers, Engineers, and Contractors (1st ed.), John Wiley & Sons, Inc.
Januar Pantiga, Anton Soekiman, KAJIAN IMPLEMENTASI BUILDING
Modul 5 pemodelan 3D, 4D, 5D, 6D, dan 7D, serta simulasi dan Level of Development (LoD) Kementerian PUPR 2018.
Nelson, Sekrsari J. 2019. Faktor yang mempengaruhi penerapan Building Information Modelling (BIM) Dalam Tahapan Pra Konstruksi Gedung Bertingkat, Jurnal Mitra Teknik Sipil.
Peraturan Menteri Pekerjaan Umum dan Perumahan Rakyat Republik Indonesia Nomor 22 / PRT /M/2018 Tentang Bangunan Gedung Negara.
PUPR, T. B. (2018). Panduan Adopsi BIM dalam Organisasi, Pusat Litbang Kebijakan dan Penerapan Teknologi.
Raflis, Yuwono Bambang, Rayshnda R. 2018. Manfaat Penggunaan Building Information Modelling (BIM) pada Proyek Konstruksi sebagai Media Komunikasi Stakeholders, Jurnal Teknik Sipil.
Rina Marina Masri, Yanuarso Afdhauluddin Saputra dan Alya Sekar Hapsari, IMPLEMENTASI BIM PADA PEMBANGUNAN GEDUNG RUMAH SAKIT Iskandar Muda Purwaamijaya, konteks 16, Bali 27 -28 oktober 2022